8–Slot Drilling Template with A MOPU, 20k BOPD Production Inclusive of Water Processing and Water/Gas Injection Facilities
CLIENT
Nkuku Ikong Energy Limited.
SCOPE / DESCRIPTION OF THE PROJECT
8–Slot Drilling Template with A MOPU, 20k BOPD Production Inclusive of Water Processing and Water/Gas Injection Facilities And 6” X 17-Km Nkuku/Ikong/Odudu Export Pipeline and Risers To The ODP1 Platform
STATUS
Ongoing

Ongoing coping of Tripod bracing pipe

TRIPOD JACKET LIFTED AND UP RIGHT IN THE WATER

Ongoing NDT on the repaired defective well deck leg joint RE-SW -138 R2

Ongoing coping of Tripod bracing pipe