8–Slot Drilling Template with A MOPU, 20k BOPD Production Inclusive of Water Processing and Water/Gas Injection Facilities
CLIENT
Nkuku Ikong Energy Limited.
SCOPE / DESCRIPTION OF THE PROJECT
8–Slot Drilling Template with A MOPU, 20k BOPD Production Inclusive of Water Processing and Water/Gas Injection Facilities And 6” X 17-Km Nkuku/Ikong/Odudu Export Pipeline and Risers To The ODP1 Platform
STATUS
Ongoing

Ongoing welding of 30” x 1” piling pipe joint SWP-15

Surface preparation on the beveled 30” x 1” piling pipe end

Ongoing NDT on the repaired defective well deck leg joint RE-SW -138 R2

Ongoing welding of 30” x 1” piling pipe joint SWP-15